Edge Banding Machine Operator Daily Report & Production Log78


[Edge Banding Workshop Clerk]

Date: October 26, 2023

This report details the activities and production output of the edge banding machine operators within our factory for the current day. It includes details on machine operation, material usage, quality control checks, and any issues encountered during production. This information is crucial for production planning, inventory management, and overall factory efficiency assessment.

Machine 1 (Automatic Edge Banding Machine): Operator – Li Wei

Start Time: 8:00 AM

End Time: 5:00 PM (1-hour lunch break)

Materials Used:
PVC Edge Banding (White, 2mm): 500 meters
PVC Edge Banding (Black, 0.4mm): 300 meters
Melamine Edge Banding (Walnut, 1mm): 200 meters

Production Output:
Cabinet Doors: 250 units
Drawer Fronts: 150 units
Table Tops: 75 units

Quality Control:

A random sample of 10% of the finished products was inspected. Minor inconsistencies in glue application were observed on 3 pieces, but these were deemed acceptable within our tolerance level. No major defects were identified. All rejected pieces were documented and set aside for rework.

Machine Maintenance:

Regular lubrication was performed as per the scheduled maintenance plan. No significant issues were reported. A minor adjustment was made to the feeding mechanism to improve the accuracy of edge banding application. This adjustment was documented in the machine maintenance log.

Issues Encountered:

A brief stoppage occurred at 11:00 AM due to a temporary power fluctuation. Production resumed within 15 minutes. This event has been recorded in the downtime log.

Machine 2 (Semi-Automatic Edge Banding Machine): Operator – Zhang Hong

Start Time: 8:00 AM

End Time: 5:00 PM (1-hour lunch break)

Materials Used:
PVC Edge Banding (Oak, 2mm): 400 meters
ABS Edge Banding (Grey, 1mm): 250 meters

Production Output:
Desk Sides: 100 units
Shelving Units: 50 units
Bed Frames: 25 units

Quality Control:

A random sample of 10% of the finished products was inspected. No defects were found.

Machine Maintenance:

Regular maintenance was conducted as scheduled. No issues were reported.

Issues Encountered:

None.

Overall Production Summary:

Total meters of edge banding used: 1950 meters.

Total number of units processed: 525 units.

Total downtime: 15 minutes (due to power fluctuation).

Overall, production for the day was satisfactory, despite the minor power interruption. Quality control checks indicate a high standard of workmanship. All materials were used efficiently, minimizing waste. Future plans include investigating ways to further improve the efficiency of Machine 1's feeding mechanism to minimize minor inconsistencies.

Recommendations:
Regular preventative maintenance should continue to be prioritized to minimize machine downtime.
Operator training on optimal glue application techniques should be reinforced.
Investigate potential upgrades for Machine 1 to increase its throughput and consistency.
Explore the possibility of incorporating a more sophisticated quality control system, potentially involving automated inspection technologies.


Clerk Signature: _________________________

Supervisor Signature: _________________________

Note: This report is a sample and should be adapted to reflect the specific circumstances of your factory's daily operations. It's recommended to maintain a detailed log of all materials used, production output, quality control results, and any issues encountered for each machine and operator.

2025-04-02


Previous:PVC Edge Banding: Light Transmission Properties and Applications

Next:Wan Shou Edge Banding: Your Premier Source for High-Quality Furniture Edgebanding in China